GESTRA · Boiler automation
Intermittent Blowdown Control
Automatically discharge the sludge and sediment that collect at the bottom of the boiler on a timed basis with MPA series blowdown valves and the TA series controller.


System
Intermittent blowdown automation
Discharge of sediment from the boiler bottom with timed, programmed blowdown.
Intermittent blowdown automationMPA series valve and TA series controller
The sludge and sediment that collect at the bottom of steam boilers are discharged automatically by timed, programmed blowdown automation.
The blowdown valves in connection sizes DN 20–50 are rated PN 40–250.
- Connection
- DN 20–50
- Pressure rating
- PN 40–250
- Valve
- MPA series
- Controller
- TA 7 series
GESTRA
GESTRA pageOther product groups
Steam trapsBK, UNA, MK and DK series
Steam trap testing deviceLeak testing and reporting with VKP 41
Condensate return monitoring systemsCondensate monitoring with OR 52 and ORGS 11-2
Non-return valvesRK, BB and CB series non-return valves- ValvesAK 45 automatic drain valve
Modulating level control systemsNRGT 26-2 capacitance level electrode
Continuous blowdown control systemsLRGT, LRGS and LRG series electrodes
Low / high level limitingNRG electrode and NRS controller
On / off level controlNRGS and NRS series level control
Quotes and support
Request a quote for an intermittent blowdown system
Share your boiler type, connection size and pressure rating, and let’s define the right valve and controller together.
